View Item 
      •   UMY Repository
      • 03. DISSERTATIONS AND THESIS
      • Students
      • Undergraduate Thesis
      • Faculty of Engineering
      • Department of Electrical Engineering
      • View Item
      •   UMY Repository
      • 03. DISSERTATIONS AND THESIS
      • Students
      • Undergraduate Thesis
      • Faculty of Engineering
      • Department of Electrical Engineering
      • View Item
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      PERANCANGAN SISTEM PLTS FOTOVOLTAIK TERPUSAT UNTUK MEMENUHI KEBUTUHAN TENAGA LISTRIK DI DESA TERPENCIL

      Thumbnail
      View/Open
      COVER (44.56Kb)
      HALAMAN JUDUL (408.0Kb)
      HALAMAN PENGESAHAN (609.6Kb)
      ABSTRAK (152.7Kb)
      BAB I (129.4Kb)
      BAB II (694.0Kb)
      BAB III (297.9Kb)
      BAB IV (2.365Mb)
      BAB V (176.9Kb)
      DAFTAR PUSTAKA (123.1Kb)
      LAMPIRAN (924.1Kb)
      NASKAH PUBLIKASI (614.7Kb)
      Date
      2018-09-01
      Author
      ISMAIL, GUSNUR
      Metadata
      Show full item record
      Abstract
      This Bachelor’s thesis was made as part of the application of Electrical Power Generation Technology courses and Design of Industrial Electrical System in Electrical engineering program at Universitas Muhammadiyah Yogyakarta. This is a solar power generation system by following the principles of renewable energy science, especially photovoltaic energy and electrical technology. A general scheme in the context of a centralized solar photovoltaic power plant system based on data and location requirements. Location data in the form of needs or limits on energy use and irradiation provided from secondary data. Based on data and calculations will be carried out capacity measurement, component selection, system design presented in the form of preliminary engineering design and economic analysis. The results of the calculation and analysis of a centralized solar photovoltaic power plant design in this study were made for electricity needs for 273 houses and 10 public facilities. From the calculation results with a total electricity demand of 185575 Wh/day can be issued with a capacity of 57,6 kWp. The design of this system wasmade using a DC coupling off-grid configuration systemusing 288 solar panels with a capacity of 200 Wp and 216 pieces of 1200 Ah battery capacity. The cost for investment is Rp 5.225.272.250, the maintenance cost for operations is Rp 85.936.700 a year and the cost of 2 times the battery change in the 9th and 18th years is Rp 2.148.417.500.
      URI
      http://repository.umy.ac.id/handle/123456789/22473
      Collections
      • Department of Electrical Engineering

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV
       

       

      Browse

      All of UMY RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV