View Item 
      •   UMY Repository
      • 03. DISSERTATIONS AND THESIS
      • Students
      • Undergraduate Thesis
      • Faculty of Engineering
      • Department of Electrical Engineering
      • View Item
      •   UMY Repository
      • 03. DISSERTATIONS AND THESIS
      • Students
      • Undergraduate Thesis
      • Faculty of Engineering
      • Department of Electrical Engineering
      • View Item
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      ANALISA POTENSI SUMBER DAYA ANGIN SEBAGAI PEMBANGKIT LISTRIK TENAGA BAYU (PLTB) BERBASIS APLIKASI HOMER DI PANTAI INDRAYANTI, GUNUNGKIDUL

      Thumbnail
      View/Open
      COVER (235.7Kb)
      HALAMAN JUDUL (550.2Kb)
      HALAMAN PENGESAHAN (231.2Kb)
      ABSTRAK (15.29Kb)
      BAB I (134.8Kb)
      BAB II (731.3Kb)
      BAB III (419.0Kb)
      BAB IV (1.986Mb)
      BAB V (219.3Kb)
      DAFTAR PUSTAKA (433.6Kb)
      LAMPIRAN (1.049Mb)
      NASKAH PUBLIKASI (846.9Kb)
      Date
      2019-07-23
      Author
      RAMADAN, NUR IKHSAN
      Metadata
      Show full item record
      Abstract
      Electricity is an energy source that is very much needed for human life. The increase in electricity energy consumption in Indonesia also has an impact on the reduction of fossil energy and the need for an increase in power plants owned by Indonesia. the solution is to utilize new renewable energy sources. According to LAPAN One potential renewable energy source in Indonesia is a source of wind energy. There is a potential for wind speeds of 4 to 5 m / s in the southern coast of Java. This study uses homer application as a research method. The wind rate data used in this study is secondary data from the NASA database with location coordinates located on Indrayanti Beach. The results of calculations and analysis on the PLTB system planning are simulated on the HOMER application, aiming to facilitate the electrical energy needs of 150 houses. From the results of calculations simulated by HOMER, the total demand for electricity use is 749.7 kWh / day, the average electricity load per hour is 31.24 kW and the possibility of a peak load that can occur within 1 year is 83.48 kWp. The design of this system HOMER uses an off-grid system configuration with a combination of 42 wind turbines with a capacity of 6 kW DC, 2616 batteries with a capacity of 4,463 Ah, and a 105 kW inverter. From the HOMER simulation with the optimal configuration of the author's choice the PLTB system can produce a total energy of 488,949 kWh / year. With AC load consumption of 273,549 kWh / year. Excess electricity or excess electricity from this plant is 195,706 kWh / year. The investment cost or Net Present Cost (NPC) of the PLTB is $3,692,447.00, the operatinonal ($ / yr) and maintenance cost is $202.82 / year.
      URI
      http://repository.umy.ac.id/handle/123456789/28734
      Collections
      • Department of Electrical Engineering

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV
       

       

      Browse

      All of UMY RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV