      KAJIAN FAKTOR RESIKO KETERLAMBATAN PADA PROYEK PEMBANGUNAN JEMBATAN DI BENDUNG KAMIJORO

      Thumbnail
      View/Open
      COVER (59.18Kb)
      HALAMAN JUDUL (425.0Kb)
      HALAMAN PENGESAHAN (58.91Kb)
      ABSTRAK (12.36Kb)
      BAB I (14.73Kb)
      BAB II (181.0Kb)
      BAB III (216.4Kb)
      BAB IV (1.020Mb)
      BAB V (11.55Kb)
      BAB VI (14.46Kb)
      DAFTAR PUSTAKA (11.89Kb)
      LAMPIRAN (228.6Kb)
      NASKAH PUBLIKASI (608.3Kb)
      Date
      2019-05-12
      Author
      TRIASTUTI, DEWI
      Metadata
      Show full item record
      Abstract
      Risk management is a science to identify and assess the potential risks that occur in a project. A risk is an event that may occur accidentally in a project. Risk is associated with possibilities or probabilities that occur beyond expectations. The implementation of the construction of bridge construction of bridge contruction projects, in general, can experience many risks, one of the risks that occur is the delay in work. This study aims to identify and assess risk factors that can cause delays in a job and identify jobs that have the highest risk of delay in the project. To identify potential events and impacts on each work carried out using the Work Breakdown Structure (WBS) and interviews, then it can be processed using the risk = event x impact approach and the results can be described by Risk Matrix. Then determine the critical path with network planning. The results of the risk assessment indicate that the work that has the highest level of risk of delay is the work of the bridge floor with an average risk value of 8.1 and weir body work with a mean risk value of 6.7.
      URI
      http://repository.umy.ac.id/handle/123456789/29991
      Collections
      • Department of Civil Engineering

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV
       

       

      Browse

      All of UMY RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV