View Item 
      •   UMY Repository
      • 01. BOOKS
      • Books
      • View Item
      •   UMY Repository
      • 01. BOOKS
      • Books
      • View Item
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      Design of Solar Power Plant: Analyze Its Potential in Parangtritis Area Using PVsyst Simulator

      Thumbnail
      View/Open
      Artikel (543.9Kb)
      Date
      2020
      Author
      Mujaahid, Faaris
      Nurhadi, Purwoko
      Syahputra, Ramadoni
      Putra, KarismaTrinanda
      Widyasmoro
      Metadata
      Show full item record
      Abstract
      The high demand of electrical energy nowadays occurs globally, including in Indonesia. One solution to overcome the problem of electricity consumption is to design solar power plants in Indonesia. The location of Parangtritis beach itself has a high potential radiation value when compared to other beaches in the Southern coast area of Yogyakarta. The total electricity demand in that location in one day is 2.9 MWh which theoretically can be supplied by 681 kWp solar power plant. The design uses a PVsyst simulator with a configuration of 2,064 solar panels with a capacity of 330 Wp each, batteries with a total capacity of 90,625 Ah, and a total area of 4256 m2. The total solar power plant investment is 23 billion IDR, including maintenance and operational costs of 234 million IDR per year.
      URI
      http://repository.umy.ac.id/handle/123456789/36626
      Collections
      • Books

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV
       

       

      Browse

      All of UMY RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV