dc.description.abstractThe high demand of electrical energy nowadays occurs globally, including in Indonesia. One solution to overcome the problem of electricity consumption is to design solar power plants in Indonesia. The location of Parangtritis beach itself has a high potential radiation value when compared to other beaches in the Southern coast area of Yogyakarta. The total electricity demand in that location in one day is 2.9 MWh which theoretically can be supplied by 681 kWp solar power plant. The design uses a PVsyst simulator with a configuration of 2,064 solar panels with a capacity of 330 Wp each, batteries with a total capacity of 90,625 Ah, and a total area of 4256 m2. The total solar power plant investment is 23 billion IDR, including maintenance and operational costs of 234 million IDR per year.en_US
dc.language.isoenen_US
dc.publisherInternational Conference on Sustainable Innovation 2020–Technology, Engineering and Agriculture (ICoSITEA 2020)en_US
dc.subjectRenewable energyen_US
dc.subjectSolar Power Planten_US
dc.subjectPVsysten_US
dc.titleDesign of Solar Power Plant: Analyze Its Potential in Parangtritis Area Using PVsyst Simulatoren_US
dc.typeArticleen_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

  • Books
    Berisi buku-buku karya dosen UMY yang diterbitkan oleh penerbit selain UMY Press dan buku ajar dosen.

Show simple item record