View Item 
      •   UMY Repository
      • 03. DISSERTATIONS AND THESIS
      • Students
      • Undergraduate Thesis
      • Faculty of Engineering
      • Department of Civil Engineering
      • View Item
      •   UMY Repository
      • 03. DISSERTATIONS AND THESIS
      • Students
      • Undergraduate Thesis
      • Faculty of Engineering
      • Department of Civil Engineering
      • View Item
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      APLIKASI METODE WORK STUDY PADA PROYEK KONSTRUKSI (STUDY KASUS RUSUNAWA LANUD TNI AU ADISUCIPTO YOGYAKARTA)

      Thumbnail
      View/Open
      ABSTRAK (194.9Kb)
      BAB I (619.2Kb)
      BAB II (4.555Mb)
      BAB III (575.6Kb)
      BAB IV (641.6Kb)
      BAB V (3.965Mb)
      BAB VI (271.7Kb)
      DAFTAR PUSTAKA (92.47Kb)
      JUDUL (1.562Mb)
      Date
      2012-01-04
      Author
      NASRUDIN, GAYUH AGUS
      Metadata
      Show full item record
      Abstract
      PENELITIAN INI BERTUJUAN UNTUK MENGETAHUI PERBANDINGAN WAKTU ANTARA WAKTU RENCANA PEMASANGAN (TIME SCHEDULE) DAN JUGA WAKTU PEMASANGAN AKTUAL JUGA UNTUK MENGETAHUI WAKTU BERSIH PEMASANGAN ELEMEN STRUKTUR
      URI
      http://repository.umy.ac.id/handle/123456789/4742
      Collections
      • Department of Civil Engineering

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV
       

       

      Browse

      All of UMY RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV