APLIKASI METODE WORK STUDY PADA PROYEK KONSTRUKSI (STUDY KASUS RUSUNAWA LANUD TNI AU ADISUCIPTO YOGYAKARTA)
dc.contributor.advisor | PRIYO,MANDIYO | |
dc.contributor.advisor | ZULFIAR,HERI | |
dc.contributor.author | NASRUDIN, GAYUH AGUS | |
dc.date.accessioned | 2016-10-11T01:54:40Z | |
dc.date.available | 2016-10-11T01:54:40Z | |
dc.date.issued | 2012-01-04 | |
dc.identifier.uri | http://repository.umy.ac.id/handle/123456789/4742 | |
dc.description | PENELITIAN INI BERTUJUAN UNTUK MENGETAHUI PERBANDINGAN WAKTU ANTARA WAKTU RENCANA PEMASANGAN (TIME SCHEDULE) DAN JUGA WAKTU PEMASANGAN AKTUAL JUGA UNTUK MENGETAHUI WAKTU BERSIH PEMASANGAN ELEMEN STRUKTUR | en_US |
dc.description.abstract | PENELITIAN INI BERTUJUAN UNTUK MENGETAHUI PERBANDINGAN WAKTU ANTARA WAKTU RENCANA PEMASANGAN (TIME SCHEDULE) DAN JUGA WAKTU PEMASANGAN AKTUAL JUGA UNTUK MENGETAHUI WAKTU BERSIH PEMASANGAN ELEMEN STRUKTUR | en_US |
dc.language.iso | other | en_US |
dc.publisher | FT UMY | en_US |
dc.subject | METODE WORK STUDY | en_US |
dc.subject | PROYEK KONSTRUKSI | en_US |
dc.title | APLIKASI METODE WORK STUDY PADA PROYEK KONSTRUKSI (STUDY KASUS RUSUNAWA LANUD TNI AU ADISUCIPTO YOGYAKARTA) | en_US |
dc.type | Thesis | en_US |