dc.contributor.advisor | ZULFIAR, MUHAMMAD HERI | |
dc.contributor.author | RARASATI, NIEKEN | |
dc.date.accessioned | 2019-09-12T06:06:07Z | |
dc.date.available | 2019-09-12T06:06:07Z | |
dc.date.issued | 2019-05-20 | |
dc.identifier.uri | http://repository.umy.ac.id/handle/123456789/28770 | |
dc.description | Pengelolaan proyek konstruksi yang baik akan dapat meminimalisir potensi
kecelakaan kerja, karena semakin besar proyek tentu akan menimbulkan permasalahan
yang besar dan kompleks. Pada penelitian ini bertujuan untuk menilai Sistem
Manajemen Keselamatan dan Kesehatan Kerja pada proyek pembangunan Rumah
Susun Tingkat Tinggi Pasar Rumput Jakarta Selatan. Penelitian dilakukan
menggunakan metode kuantitatif dengan cara observasi di lokasi, Proses pengambilan
data melalui diskusi terbatas secara langsung bersama para karyawan dimana
informasinya digunakan sebagai bahan dari penelitian. Hasil analisis berupa gambaran
secara jelas tentang pelaksanaan Sistem Manajemen Keselamatan dan Kesehatan
Kerja. Dari penelitian ini diperoleh nilai sebesar 83,87% angka ini dikategorikan
SEDANG dalam pelaksanaan SMK3 karena nilainya berada diantara 60%-85% dan
nilai kelengkapan fasilitas K3 sebesar 89,1% angka ini dikategorikan SEDANG dalam
hal kelengkapan fasilitas K3 karena nilainya berada diantara 60-85%. | en_US |
dc.description.abstract | The good management of a construction project will be able to minimize the
potential for workplace accidents, because the larger project will certainly cause big
and complex problems. In this study aims to asess of Occupational Safety and Health
Management System in the Pasar Rumput Flats Building Project at the South Jakarta.
The results of the analysis begin with direct observation data through interviews at the
location to obtain the real answer of the implementation Occupational Safety and
Health Management System. From this study obtained a value of 83.87%, this figure is
categorized as MEDIUM in the implementation of SMK3 because its value is between
60% -85% and the completeness value of K3 facilities is 81,8% it is MEDIUM
categorized in completing K3 facilities because its value is between> 85% | en_US |
dc.publisher | FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH YOGYAKARTA | en_US |
dc.subject | Management System, K3, Construction Project, Building, Flats | en_US |
dc.title | EVALUASI SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA (SMK3) PADA PROYEK PEMBANGUNAN GEDUNG RUMAH SUSUN SEWA TINGKAT TINGGI PASAR RUMPUT JAKARTA SELATAN | en_US |
dc.type | Thesis | en_US |