View Item 
      •   UMY Repository
      • 03. DISSERTATIONS AND THESIS
      • Students
      • Undergraduate Thesis
      • Faculty of Engineering
      • Department of Civil Engineering
      • View Item
      •   UMY Repository
      • 03. DISSERTATIONS AND THESIS
      • Students
      • Undergraduate Thesis
      • Faculty of Engineering
      • Department of Civil Engineering
      • View Item
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      ANALISIS DAMPAK LALU LINTAS (ANDALALIN) PEMBANGUNAN UNDERPASS KENTUNGAN

      Thumbnail
      View/Open
      COVER (56.98Kb)
      HALAMAN JUDUL (792.0Kb)
      HALAMAN PENGESAHAN (1.025Mb)
      ABSTRAK (10.06Kb)
      BAB I (12.43Kb)
      BAB II (263.1Kb)
      BAB III (363.3Kb)
      BAB IV (2.972Mb)
      BAB V (119.1Kb)
      DAFTAR PUSTAKA (124.2Kb)
      LAMPIRAN (2.520Mb)
      NASKAH PUBLIKASI (713.0Kb)
      Date
      2020-03-20
      Author
      PUTRA, M. AFRIZAL ZOHRI
      Metadata
      Show full item record
      Abstract
      The construction of Underpass at Kentungan intersection is one of a solution to improve the road network performance on the D.I. Yogyakarta and reduce the frequent congestion and queue length . Therefore, to determine the magnitude of the impact of traffic caused by the development and efforts to deal with the problems that occur, a Traffic Impact Analysis study is needed. This study aims evaluated the performance of Kentungan intersection from the construction of the underpass, especially during construction. Data are collected through surveys of road invtentory, traffic volume, spot speed, intersection geometrics, queue length and cycle time of phase of Kentungan intersection. The analysis of traffic performance refers to Manual Kapasitas Jalan Indonesia (MKJI) 1997. The results of the study showed that at the construction stage of Kentungan intersection had a total traffic volume is 3585 pcu / hour with a degree of saturation of 0.707, an average delay of the intersection is 40.92 and the level of service is E; for the operational stage of underpass the results obtained are the level of services included in category C. The solution for handling during construction is to divert traffic flow at the Kentungan intersection especially for heavy vehicles and alternatively during operation using the change in APILL cycle time from north and south.
      URI
      http://repository.umy.ac.id/handle/123456789/34656
      Collections
      • Department of Civil Engineering

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV
       

       

      Browse

      All of UMY RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      DSpace software copyright © 2002-2015  DuraSpace
      Contact Us | Send Feedback
      Theme by 
      @mire NV