ANALISIS KOORDINASI PROTEKSI RELE ARUS LEBIH PADA UNIT INT IPP PT PETROKIMIA GRESIK
(FT UMY, 2018-03-01)
PT Petrokimia Gresik is the largest and most complete fertilizer producer in
Indonesia which has a huge production target. Therefore, all matters relating to the
achievement of targets need to be managed properly. No ...
ANALISIS KOORDINASI PROTEKSI OVERCURRENT RELAY (OCR) PADA SISTEM KELISTRIKAN INDUSTRI DI PT. DIAN SWASTATIKA SENTOSA PLANT 1 TBK KARAWANG
(FT UMY, 2018-02-24)
Industry is one of the sectors affecting economic growth rate. With the development of industrial sector, unemployment rate will decrease. But on the other hand, the capacity of energy use will increase as the production ...
SISTEM PEMANEN ENERGI MENGGUNAKAN MODUL LTC3588 PADA IMPLEMENTASI PEMBANGKIT LISTRIK BERBASIS PIEZOELEKTRIK DI TANGGA BANGUNAN
(FISIP UMY, 2018-05-04)
Research and innovation in the development of renewable energy utilization continues growing. One potential of renewable energy that can be uses is human energy. Activities like walking up and down the stair, humans certainly ...
STUDI PERANCANGAN SISTEM SERI, PARALEL DAN KOMBINASI PADA TEKNOLOGI MICROBIAL FUEL CELL SEBAGAI PRODUKSI ENERGI LISTRIK MENGGUNAKAN LIMBAH INDUSTRI TAHU
(FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH YOGYAKARTA, 2018-04-21)
Indonesia is one country with high electricity consumption. Electrical energy demand in Indonesia is creasing in past few years. However, the use of crude oil as the source of energy is still dominating, while the reserve ...
ANALISIS KEANDALAN JARINGAN DISTRIBUSI DI PT. PLN (Persero) RAYON SRIBHAWONO
(FT UMY, 2018-04-20)
Reliability level at distribution network can be determine by count the extinguishing frequency and by duration of extinguishing in distribution network at the certain time. The purpose of research is to know how the ...
PERANCANGAN DAN PEMBUATAN TANGGA PENGHASIL LISTRIK BERBASIS PIEZOELEKTRIK
(FT UMY, 2018-04-27)
Demand of electricity is significantly growing. Therefore, the consumption
of fossil fuels has been increasing to evoke the electrical energy. This will lead to
the fossil fuels scarcity. The solution of this problem is ...
ANALISIS PEMBEBANAN TRANSFORMATOR BERDASARKAN PERTUMBUHAN BEBAN DI GARDU INDUK 150 KV MRICA BANJARNEGARA
(FT UMY, 2018-05-09)
Electric power has become a primary need for all human beings to perform daily activities. The rapidly growing population and economy each year makes the need for electricity is also increasingly increase. So the population ...
ANALISIS THERMOVISI UNTUK MENEMUKAN HOT POINT PADA GARDU INDUK 150 KV BANTUL
(FT UMY, 2018-05-21)
One of the maintenance actions of the equipment at the substation is temperature measurement using Thermal Imagers which is usually called the Thermovision measurement. Non-touch temperature measurements also have a ...
ANALISIS KEANDALAN SISTEM DISTRIBUSI TENAGA LISTRIK
(FT UMY, 2018-05-22)
Reliability is the level of performance success of a system or part of the
system, to be able to provide better results over a certain period of time and under
certain operating conditions. To be able to determine the ...
LOAD SHARING PADA OPERASI PARALEL GENERATOR DI PLTU SURALAYA
(FT UMY, 2018-05-19)
Significant load changes on the electricity system, resulted it running outside of the stable limit, so that the stability of the system is necessary, because of the problem, in this Final Project required research to get ...