Browsing Department of Civil Engineering by Author "PRIYO, MANDIYO"
Now showing items 1-20 of 31
-
ANAISA WAKTU PELAKSANAAN PROYEK KONSTRUKSI DENGAN VARIASI PENAMBAHAN JAM KERJA (LEMBUR) (Studi kasus : Pekerjaan Pembangunan Jembatan Padangan-Kasiman Kabupaten Bojonegoro)
SARTIKA, SARTIKA (FT UMY, 2014-08-25)Waktu dan biaya sangat berpengaruh terhadap keberhasilan dan kegagalan suatu proyek. Tolak ukur keberhasilan proyek biasanya dilihat dari waktu penyelesaian yang singkat dengan biaya yang minimal tanpa meninggalkan mutu ... -
ANALISA PENGENDALIAN DURASI DAN BIAYA KONSTRUKSI PEKERJAAN JALAN DI SUMATRA SELATAN DENGAN METODE DURATION AND COST TRADE OFF
PRABOWO, UTMAN DWI (FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH YOGYAKARTA, 2019-02-22)Infrastructure development in Indonesia has experienced a significant development. This fact is reflected in the increasing development both in the road sector and other infrastructure facilities. A project that is carried ... -
ANALISIS BIAYA DAN WAKTU PROYEK KONSTRUKSI DENGAN PENAMBAHAN JAM KERJA (LEMBUR) DIBANDINGKAN DENGAN PENAMBAHAN TENAGA KERJA MENGGUNAKAN METODE TIME COST TRADE OFF (Studi Kasus : Pekerjaan Pembangunan Gedung Pusat Jantung Terpadu Tahap II RSUP DR. SARDJITO YOGYAKARTA (Lt.Empat-Lt.Dak Atap) )
AJINUGRAHA, FAIZAL RYAN (FT UMY, 2016-08-03)Dalam pelaksannan proyek konstruksi ada tiga faktor yang mempengaruhi terhadap keberhasilan dan kegagalan pada suatu proyek yaitu waktu, biaya dan mutu. Tolak ukur keberhasilan proyek biasanya dilihat dari waktu penyelesaian ... -
ANALISIS PENAWARAN KONTRAKTOR DENGAN METODE SISTEM GUGUR DAN SISTEM NILAI (MERIT POINT SYSTEM)
ROSELINA, CONNY SURYA AYU (FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH YOGYAKARTA, 2019-05-20)Designation a main-contractor and subcontractor to performing construction works is very substantial and critical. The elimination and the value system method (Merit Point System) are considered to be used to obtain proper ... -
APLIKASI VALUE ENGINEERING PADA PROYEK KONSTRUKSI (Studi kasus : Proyek Pembangunan Jembatan Tebat Gheban Kota Pagar Alam)
HARMOKO, HARMOKO (FAKULTAS TEKNIK UMY, 2016)Tujuan dari penelitian ini adalah untuk mengaplikasikan value engineering dan melakukan analisis teknis pada Proyek Pembangunan Jembatan Rangka Baja dengan Sistem Pelengkung. Jembatan Tebat Gheban dibangun dengan panjang ... -
APLIKASI VALUE ENGINEERING PADA PROYEK KONSTRUKSI PEMBANGUNAN GEDUNG RUMAH SUSUN PEMERINTAH KOTA MAKASSAR
NATSIR, ADIYATMA (FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH YOGYAKARTA, 2018-05-23)Value Engineering merupakan suatu proses pembuatan keputusan berbasis multidisiplin yang sistematis dan terstruktur melakukan analisis fungsi untuk mencapain nilai terbaik pada sebuah proyek dengan mendifinisikan fungsi-fungsi ... -
EFISIENSI BIAYA DAN WAKTU PELAKSANAAN PROYEK DENGAN METODE CRASHING (STUDI KASUS : PROYEK PEKERJAAN PEMBANGUNAN GEDUNG INSPEKTORAT KOTA YOGYAKARTA)
SURYANTO, SUGI (FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH YOGYAKARTA, 2017)Pelaksanaan proyek konstruksi tidak lepas dari pengelolaan biaya dan waktu untuk menghasilkan proyek yang menguntungkan, tepat waktu, dan tidak meninggalkan kualitas atau mutu dari hasil pekerjaan konstruksi itu sendiri. ... -
EFISIENSI BIAYA DAN WAKTU PELAKSANAAN PROYEK KONSTRUKSI DENGAN METODE CRASHING PADA PROYEK PEMBANGUNAN JALAN TOL PANDAAN - MALANG ZONA 1
SAMUDRA, MUHAMMAD ALFIAN (FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH YOGYAKARTA, 2018-07)Dalam pelaksanaan suatu proyek, biaya dan waktu sangat berpengaruh apakah proyek itu dikatakan berhasil atau mengalami kegagalan. Keberhasilan yang sering menjadi ukuran biasanya dilihat dari biaya yang minimal dan waktu ... -
EFISIENSI BIAYA DAN WAKTU PELAKSANAAN PROYEK KONSTRUKSI DENGAN METODE CRASHING PADA PROYEK PEMBANGUNAN JALAN TOL PANDAAN-MALANG ZONA 3 STA 15+600 - 19+225
ALFAIQ, M JIHAD (FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH YOGYAKARTA, 2018-06-04)Keberhasilan dari jalanya sebuah proyek dipengaruhi oleh faktor-faktor yaitu waktu dan biaya. Tolak ukur kesuksesan dari proyek tersebut dapat diukur dari durasi dalam penyelesaian proyek tersebut dengan singkat dan dengan ... -
EFISIENSI BIAYA DAN WAKTU PELAKSANAAN PROYEK KONSTRUKSI DENGAN METODE CRASHING PADA PROYEK PEMBANGUNAN JALAN TOL PANDAAN-MALANG ZONA 4 STA 19+225 – 20+725
MAHENDRA, YURIS IHSA (FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH YOGYAKARTA, 2018-07)Waktu dan biaya merupakan faktor yang sangat berpengaruh dalam keberhasilan dan kegagalan suatu proyek. Keberhasilan suatu proyek dapat dilihat pada tolak ukur penyelesaian proyek tersebutyang singkat dengan biaya sememinimal ... -
EFISIENSI BIAYA DAN WAKTU PELAKSANAAN PROYEK KONSTRUKSI DENGAN METODE CRASHING PADA PROYEK PEMBANGUNAN JEMBATAN PABELAN DI RUAS JALAN MENDUT-TANJUNGJAPUAN
ARIEF, FAISHAL RACHMAN (FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH YOGYAKARTA, 2019-07-22)The successful completion of a project is strongly influenced by certain factors, including short completion times and low costs but does not neglect the quality of work that will be produced at the end of the project. One ... -
EFISIENSI BIAYA DAN WAKTU PELAKSANAAN PROYEK KONSTRUKSI DENGAN METODE CRASHING PADA PROYEK PEMBANGUNAN JEMBATAN PABELAN DI RUAS JALAN TLATAR TALUN
SETIANINGSIH, RINI (FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH YOGYAKARTA, 2019-03-11)The success of the net of a project is influenced by factors such as duration of completion of the project briefly and at a minimal cost but do not eliminate the quality elemen of the work that will be generated from the ... -
EFISIENSI BIAYA DAN WAKTU PELAKSANAAN PROYEK KONTRUKSI DENGAN METODE CRASHING PADA PROYEK PEMBANGUNAN JALAN DAN JEMBATAN NGALANG -NGUWOT – GADING
UTAMI, DESTA RIYAN (FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH YOGYAKARTA, 2018-10-30)Keberhasilan dari suatu proyek dilihat dari waktu penyelesaian yang singkat dan biaya yang dikeluarkan sedikit. Pengelolaan suatu proyek yang sistematis diperlukan untuk memastikan waktu pelaksanaan proyek sesuai dengan ... -
EFISIENSI BIAYA DAN WAKTU PELAKSANAAN PROYEK KONTRUKSI DENGAN METODE DURATION COST TRADE OFF PADA PROYEK PEMBANGUNAN JALAN TOL PANDAAN - MALANG ZONA 2 STA 13+725 – 15+575
KUMARA, ARDHAN (FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH YOGYAKARTA, 2018-07-21)Time and cost are the main factors in the failure and success of a project. The success of a project is seen on a short project completion benchmark at a minimal cost but does not forget the quality of the end result of a ... -
EVALUASI TEBAL PERKERASAN DENGAN METODE BINA MARGA 2017 DAN AASHTO 1993 SERTA PENGARUHNYA TERHADAP RAB
HALIM, SALAFUDDIN NOOR (FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH YOGYAKARTA, 2018-12-24)The road pavement has significant contribution in providing service for traffic. The pavement structure must be able to hold traffic load in accordance to its life design with the least amount of construction cost. The ... -
MODEL STRATEGI HARGA PENAWARAN UNTUK PROYEK KONSTRUKSI DI INDONESIA (STUDI KASUS LAYANAN PENGADAAN SECARA ELEKTRONIK (LPSE) DI NANGROE ACEH DARUSSALAM)
SYAMSURIADI, SYAMSURIADI (2017-04-01)Strategi penawaran bagi suatu perusahaan sangatlah bergantung pada tujuan perusahaan, diantaranya adalah dengan memaksimumkan keuntungan. Permasalahan utama kontraktor dalam mengajukan penawaran adalah menetapkan harga ... -
PERCEPATAN PROYEK JEMBATAN MENGGUNAKAN METODE TIME COST TRADE OFF DENGAN PENAMBAHAN JAM KERJA DAN JUMLAH ALAT PADA PROYEK JEMBATAN TALILO CS
BRILIANTI, DWI PUTRI (FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH YOGYAKARTA, 2019-07-22)The success of a construction project is influenced by two important factors, duration of completion of the project briefly and at a minimal cost but do not eliminate the quality element of the work that will be generated ... -
STUDI OPTIMASI WAKTU DAN BIAYA DENGAN METODE TIME COST TRADE OFF PADA PROYEK KONSTRUKSI
ISRODIN, MUHAMMAD (FAKULTAS TEKNIK UMY, 2017-04)Agar durasi suatu proyek konstruksi tidak mengalami keterlambatan dan sesuai dengan waktu yang diisyaratkan, maka salah satu cara yang dapat dilakukan adalah mempercepat durasi pelaksanaan proyek (crashing). Salah ... -
STUDI OPTIMASI BIAYA DAN WAKTU MENGGUNAKAN METODE DURATION COST TRADE OFF PADA PEMBANGUNAN GEDUNG RUANG RAWAT RUMAH SAKIT UMUM KARDINAH KOTA TEGAL
SYOFIANDA, MOHAMAD ZAKA ZISMA (FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH YOGYAKARTA, 2018-08-24)Cost optimization and duration are really important for construction project in order to get maximum profit. Accelerating the project duration has the goal to avoid the delay of project’s completion. This delay would cause ... -
STUDI OPTIMASI BIAYA DAN WAKTU MENGGUNAKAN METODE DURATION COST TRADE OFF PADA PROYEK PEMBANGUNAN HOTEL THE KARANIE YOGYAKARTA
SABILLA, BELADINA (FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH YOGYAKARTA, 2018-07-21)In the construction project planning, time and cost greatly affect the success and failure of a project. The implementation of a construction project is a sequence of interdependent activities between one job and another.. ...