Department of Civil Engineering: Recent submissions
Now showing items 81-100 of 932
-
PENERAPAN SISTEM DRAINASE BERKELANJUTAN DI KAWASAN PERKOTAAN SEBAGAI UPAYA MITIGASI BENCANA BANJIR
(FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH YOGYAKARTA, 2019-05-29)Every year, Yogyakarta population are getting increased. Besides the permanent residents, temporary residents such as the students or the scholars which are going to continue their study in Yogyakarta take appreciable role ... -
KUAT TEKAN BETON UNTUK RIGID PAVEMENT DENGAN CAMPURAN LIMBAH STEEL SLAG SEBAGAI PENGGANTI AGREGAT HALUS DAN PENAMBAHAN ZAT ADDITIVE DENGAN VARIASI UMUR BETON
(FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH YOGYAKARTA, 2019-04-22)At his time of development industrial technology very fast, there are many industrial waste production as well as industrial steel waste known as Steel Slag. Steel Slag is derived from deposits of residual steel melting ... -
STUDI OPTIMASI WAKTU DAN BIAYA DENGAN METODE TIME COST TRADE OFF PADA PEKERJAAN PENAMBAHAN LAJUR RUAS KOPO – BUAH BATU JALUR B PADA JALAN TOL PADALARANG - CILEUNYI
(FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH YOGYAKARTA, 2019-07-04)A project that called successful were made by on time schedule and appropriate cost. by made it haste and compressing the cost of project without decreasing the quality of works, that will guide us to avoid project failure ... -
ANALISIS KERUSAKAN JALAN DENGAN METODE PAVEMENT CONDITION INDEX (PCI) DAN RENCANA ANGGARAN BIAYA PERBAIKAN
(FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH YOGYAKARTA, 2019-06-16)Road is an important part to smoothen the transportation facilities both structural and functional. The damaged road must be observe in order to provide safety to any road users. Therefore, the observations must be done ... -
STUDI OPTIMASI WAKTU DAN BIAYA DENGAN METODE TIME COST TRADE OFF PADA PROYEK KONSTRUKSI PEMBANGUNAN JEMBATAN KALI KABUYUTAN
(FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH YOGYAKARTA, 2019-07-02)The success of a project can be seen from a short duration and small cost. A project managed systematically so that the timing of the work can be ascertained to be the same as planned or can be accelerated from the ... -
ASESMEN BANGUNAN SUNGAI DI YOGYAKARTA PASCA BADAI CEMPAKA 2017
(FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH YOGYAKARTA, 2019-06-24)Tropical cyclone Cempaka which occurred on December 28 and 29 November 2017 causes huge waves on the sea, high winds, flooding, landslide. Damage to the infrastructure of the river also occurred due to flooding caused by ... -
KAJIAN FAKTOR RESIKO KETERLAMBATAN PADA PROYEK PEMBANGUNAN JEMBATAN DI BENDUNG KAMIJORO
(FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH YOGYAKARTA, 2019-05-12)Risk management is a science to identify and assess the potential risks that occur in a project. A risk is an event that may occur accidentally in a project. Risk is associated with possibilities or probabilities that ... -
ANALISIS DESAIN TULANGAN PENGHUBUNG BORED PILE KE PILE CAP UNTUK MENAHAN GAYA GESER DASAR
(FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH YOGYAKARTA, 2019-09-12)Damage that occurs in the foundation due to earthquake can have a fatal impact on the building above it. The base shear force that occur on the building foundation can cause bored pile and pile cap connections damaged. ... -
OPTIMASI WAKTU DAN BIAYA PROYEK DENGAN PENAMBAHAN JAM KERJA (LEMBUR) PADA PROYEK PEMBANGUNAN MASJID BAITURRAHMAH KABUPATEN SUKOHARJO - JAWA TENGAH
(FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH YOGYAKARTA, 2019-09-12)Time and cost are very influential factors in the failure and success of a project. The success of a project is seen in the short benchmarks of project completion with minimal costs but do not forget the quality of the ... -
ASESMEN MORFOLOGI DAN INSFRASTRUKTUR SUNGAI BERBASIS GIS DI WILAYAH YOGYAKARTA
(FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH YOGYAKARTA, 2019-09-27)On 28 and 29 November 2017, in Yogyakarta a tropical cyclone occurred which caused a massive wave of disasters in the sea, strong winds, landslides, heavy rain, which caused damage to river, beach, road and settlement ... -
IDENTIFIKASI RISIKO KETERLAMBATAN PADA PROYEK PEMBANGUNAN GEDUNG SEKOLAH SMA MUHAMMADIYAH 3 YOGYAKARTA
(FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH YOGYAKARTA, 2019-09-03)Development in various fields is an effort to create prosperity and prosperity for the people. Therefore, the results of development must be enjoyed by all people in a fair and equitable manner. With the development ... -
PERBANDINGAN WAKTU PELAKSANAAN METODE TOP-DOWN DAN BOTTOM-UP PADA PROYEK PEMBANGUNAN BASEMENT GEDUNG BERTINGKAT TINGGI
(FT UMY, 2019)Seiring dengan perkembangan dan pertumbuhan perekonomian di Indonesia, pembangunan gedung bertingkat banyak dilakukan guna memenuhi kebutuhan akan tersedianya sarana penunjang. Namun, ketersediaan lahan di kotakota besar ... -
TINJAUAN INFRASTRUKTUR DAN SEMPADAN SUNGAI PADA WILAYAH RENTAN TERDAMPAK BANJIR LAHAR DINGIN DI DAERAH ALIRAN SUNGAI (DAS) KALI PABELAN
(FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH YOGYAKARTA, 2019-08-02)Debris Flows are the next impact of volcanis eruption, lava that accurs around the volcano will be carried down through the mountain slopes when high intensity rainfall accurs. Pabelan River is one of the rivers affected ... -
IDENTIFIKASI POTENSI RISIKO KETERLAMBATAN PADA PROYEK SHOTCRETE WITH ROCK BOLT DI BANYUMAS
(FT UMY, 2019)Identifikasi terhadap risiko menjadi semakin penting, banyak terjadi kegagalan pengelolaan risiko yang dapat mengakibatkan keterlambatan pengerjaan proyek, baik bagi organisasi, bahkan juga individu–individu. Untuk ... -
PEMODELAN SEMI PEDESTRIAN KAWASAN MALIOBORO DENGAN KONSEP GIRATORI SEARAH JARUM JAM
(FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH YOGYAKARTA, 2019-07-24)Malioboro is a tourist attraction frequented by tourists. As a result, the Malioboro area has become very crowded. The plan of the Special Region of Yogyakarta made the Malioboro area a semi-pedestrian area with a gyratory ... -
PENGARUH PERUBAHAN TATA GUNA LAHAN TERHADAP KERENTANAN BANJIR WILAYAH YOGYAKARTA (STUDI KASUS DAERAH ALIRAN SUNGAI GAJAH WONG)
(FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH YOGYAKARTA, 2019-07-02)Land use is an embodiment of the inner space about how land use is organized both naturally and planned. The land will develop follow the pattern that has been set in a certain period of time due to planning. Planning ... -
ANALISIS POTENSI RESIKO KECELAKAAN KERJA PADA PROYEK PEMBANGUNAN JEMBATAN RANGKA BAJA
(FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH YOGYAKARTA, 2019-09-20)Along with the quick development of bridge construction in Indonesia, the role of work accident risk control is felt to be increasingly important. But in reality the implementation of the Occupational Safety and Health ... -
POTENSI RISIKO KECELAKAAN KERJA PADA PEMBANGUNAN GEDUNG KEPERAWATAN GIGI POLTEKES KEMENKES YOGYAKARTA
(FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH YOGYAKARTA, 2019-09-20)Lack of awareness of the workers to use personal protective equipment so that caused a higher risks of Work Accident on Construction of Dental Nursing Building Poltekes Kemenkes Yogyakarta. The purpose of this study was ... -
PENGARUH KELAYAKAN BALIHO TERHADAP KESELAMATAN PENGGUNA JALAN DI YOGYAKARTA
(FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH YOGYAKARTA, 2019-07-19)Billboards come from Arabic, which means to convey. As for what is conveyed is an implied message, promotion, advertisement or telling something that is known by the general public. The size of a large billboard is made ... -
FRESH PROPERTIES DAN KUAT LENTUR SELF FIBER COMPACTING CONCRETE (SFCC) DENGAN BAHAN TAMBAH SILICA FUME DAN SERAT NYLON
(FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH YOGYAKARTA, 2019-07-22)Self fiber compacting concrete (SFCC) is a development of conventional concrete with the addition of silica fume, superplasticizer, and nylon fiber. It has a high level of fluidity so that it can flow into the mold with ...